Picture case study: Wind Turbine Installation

Wind Turbine foundations are laid:

Wind turbine pedestal:

Concrete is poured into the wind turbine foundations:

Close up of the wind turbine’s nuts and bolts:

Wind turbine erection:

The second and third sections of the wind turbine tower are lifted into place:

The wind turbine blades are positioned:

Finished wind turbine:

Leave a Reply

XHTML: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>