If you install a wind turbine, you are more than likely going to do it by becoming an autoproducer. An Autoproducer is defined as someone who generates and consumes electricity at single premises, essentially for their own consumption. At the moment in Ireland multiple clients cannot be supplied from the same wind turbine installation.

When a wind turbine is connected on-site, if the load is equal to or greater than the output of the turbine, there will be zero export with all energy being consumed on-site. At times of low load such as night time and or weekends when the wind turbine output is greater than the load, the excess is exported. Ideally, an autoproducer would consume 70% to 100% of the energy produced on-site. This is because for every kWh they generate and use, they make a saving of 16-18 cent.

The table below illustrates payments available under this scheme

Example 1: 300kw wind turbine using 100% of electricity generated

Your wind turbine would produce approximately 655,500kWh per annum (Depending on factors such as wind speed). If you are paying 16 cent per kWh, this equates to a saving of €104,880, if you are using 100% of the electricity you generate.

Example 2: 300kw wind turbine using 70% of electricity generated

For example, your site may have a load of 458850kWh per annum. In this case you will be exporting 30% back to the grid, which is 196,650kWh. The market rate per kWh sold back to the grid at the moment is approximately 6.5c per kWh (€65 per MWh). This will earn you €12,782.25 when sold back to the grid in addition to your saving of €73,416 on electricity. Furthermore, in this case, you can claim an additional 9.90 per MWh (.0099 per kWh). This is a monetary saving of €1,947. The amount of money earned by a 300kW wind turbine at 70% capacity in this example is €88,145 per year.So as you can see from the examples above, installing a wind turbine through the autoproducer route makes perfect business sense. However, it is worth noting that the higher your capacity the greater the savings per annum and the quicker your project will reach payback. What is evident is that the Irish government could be doing more to support wind energy and renewables, especially compared to the UK and Northern Ireland feed in tariff of 24p per kWh.

The scheme is open to new plants built and operational between 1/1/2010 and 31/12/15 that can fulfil the terms and conditions including planning permission and grid connection.

If you are considering becoming an autoproducer, Enerpower offer a number of services you may find helpful.