• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

Biomass Boiler Installation Epa

The Environmental Protection Agency is at the front line of environmental protection and policing.  They ensure that Ireland’s environment is protected, and they monitor changes in environmental trends to detect early warning signs of neglect or deterioration. They have a wide range of functions to protect the environment, and their primary responsibilities include:
 
•    Environmental licensing
•    Enforcement of environmental law
•    Environmental planning, education and guidance
•    Monitoring, analysing and reporting on the environment
•    Regulating Ireland’s greenhouse gas emissions
•    Environmental research development
•    Strategic environmental assessment
•    Waste management

The E.P.A. Regional Inspectorate installed a Gilles 240kw Wood pellet boiler to heat their offices and laboratory in Inishcarra, County Cork.

EPA Boiler
EPA Fuel Store

Contact us on +353 051 364 054 for more information or email us directly below.

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • SOLAR-PV-SYSTEMSTricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Waterford Office: Unit 24, Waterford Business Park, Cork Road, Waterford. X91 FW61.

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
Biomass Boiler, Forest Park Leisure Centre Enerpower Wind Turbine Installed At Meade Potato Company, Navan, Co. Meath
Scroll to top