• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

Biomass Boiler Installation Period Mansion

Located in Collinstown in Co. Westmeath a 300 year old period mansion has installed a 145kW HPK-RA Gilles woodchip boiler. This biomass boiler replaces their original oil boiler, reducing their carbon consumption by 53 tonnes. The boiler provides 100% of their space heating and hot water requirement and is connected to their original heating system. A barn was converted into a 60 meters cubed fuel store and boiler house, no planning permission was required. The fuel is feed by means of a swept arm and transport auger. Woodchip fuel is purchased from a local supplier. As Gilles woodchip boilers can burn a range of different fuels including: miscanthus, willow, wood logs etc. they have a choice of fuel suppliers ensuring supply. This project was funded by SEAI reheat grant scheme. Enerpower provide a maintenance contract that includes an annual visit and emergency response.

If you are interested in reducing your home heating costs enerpower have a range of biomass solutions that could help you achieve this goal. Please contact us for more information.

Contact us on +353 051 364 054 for more information or email us directly below.

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • SOLAR-PV-SYSTEMSTricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Waterford Office: Unit 24, Waterford Business Park, Cork Road, Waterford. X91 FW61.

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
Wood Chip Boiler Installation Private Household Dublin biomass Pellet Boiler Biomass Boiler, Royal Marine Hotel
Scroll to top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok