• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

Enerpower Supplied, Installed And Commissioned A 160kwh Biomass Boiler For Tesco In Wicklow.

A  biomass boiler was installed for tesco in Wicklow as the existing oil boiler in the tesco Wicklow store was approximetely 20 years old and approaching end of life. Enerpower were asked to offer an innovative renewable solution for heating this medium sized Tesco store. Enerpower looked at the existing heat load and heating system, then put together a proposal to convert to renewable energy.

Solution:

Enerpower proposed a biomass heating system financed and operated on an ESCO based model. This model required no capital outlay from our Client Tesco Ireland while offereing them a 15% saving on energy costs.

The heating solution was a biomass boiler in Tesco Wicklow contained in a removable shed like structure. The existing heating system was reconfigured to allow the biomass to provide 95% of the heat load and the existing oil to back the biomass up in the event of increased load or technical difficulties. Certain elements of the building controls and internal fabric were also improved as part of the works. The onsite programme for the works was 2 weeks and heating to the store was only disrupted for four hours over night during closed hours. The system has been running seamlessly since late 2013 and due to the success of the project Enerpower have succeeded in securing two additional projects with TESCO Ireland and are adding the finishing touches to proposals for several other projects.

Contact us on +353 051 364 054 for more information or email us directly below.

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • SOLAR-PV-SYSTEMSTricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Waterford Office: Unit 24, Waterford Business Park, Cork Road, Waterford. X91 FW61.

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
St Columbas Nursing Home Ballinderreen Co.galway Meteor Electrical Installs Three Gilles Biomass Boilers Under Rhi Scheme With...
Scroll to top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok