• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

375kW Commercial Solar Array and a 14kW Heat Pump Installed at Banagher Concrete facility.

COMMERCIAL-SOLAR-ARRAY

Banagher Concrete have recently installed a 375kw commercial solar array following an energy audit conducted by Enerpower. Banagher Concrete located in Co. Offaly wanted to invest in a commercial solar system at their facility. The energy audit conducted found a two-roof install would best suit Banagher Concrete operations in helping them reduce their environmental impact and reduce operational costs.

Banagher Concrete has been manufacturing precast concrete since 1949 and are constantly striving to better their operations without compromising their high-quality products placing them at the forefront of construction and civil engineering. Banagher Concrete are the leading precast manufacturers in Ireland and the UK.

Banagher Concrete believes their economic, legal and philanthropy responsibilities are a true reflection of their integrity.  They respect their environment as they actively strive towards reducing their impact on the environment by promoting good environmental practices. The installation is another testament to their commitment to the environment.

Banagher Concretes environmental policy ‘Tread Softly’ allows the company to make changes which will ensure positive lasting legacies for future generations.

This commercial solar array project consisted of 1,043 solar panels. These 375w Longi Solar Panels allow for high efficiency and generate electricity in low light situations. 3 Huawei Sun 2000 Inverters were used during this project, such inverters convert DC power to AC which allows for the production of electricity. A Van Der Valk Rooftop Mounting system was used to hold and set panels in place. This mounting system has been tested through various weather conditions. Solar energy installation are extremely beneficial to companies as they help reduce overall energy costs whilst also avoiding future energy price increases and carbon taxes.

A 14kW heat pump was also installed at Banagher Concrete facility. Heat pumps work efficiently because they simply transfer heat rather than burn fuel to create it. As heat pumps move heat rather than generate it, they can provide up to four times the amount of energy they consume. Banagher Concrete now provide their own form of electricity as well as heat. Both renewable energy systems compliment each other when combined.

Enerpower are delighted to have worked on this project and are thrilled to have helped Banagher Concrete fulfil their sustainability goals the company was assigned an experienced project manager and engineer who fully managed this project. A witness test was successfully completed by the ESB This project complies with all regulations and standards.

If your business would like to reduce their impact on the environment whilst also saving on energy costs, please call a member of our team on 051 364 054

 

commercial-solar-arraycommercial-solar-array2

 

 

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • SOLAR-PV-SYSTEMSTricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Waterford Office: Unit 24, Waterford Business Park, Cork Road, Waterford. X91 FW61.

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
Enerpower have installed a total of 52kWp across three Certa fuelling stati... GROUND-MOUNTED-ARRAY 500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.
Scroll to top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok