• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
    • Solar Panel Maintenance
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

Castle Paints make the move towards renewable energy by investing in a two unit rooftop Solar PV array at their facility in Tullamore.

Two Solar Power Systems of 22.5kWp were installed at Castle Paints in Tullamore Co. Offaly. This 20,000 sq/ft facility provides a range of products and services to industries such as construction and agricultural.  The installation is part of Castle Paints overall commitment to improving their impact on the environment as they aim to make changes throughout the company by not only installing a renewable energy source, but they also aim to use recycled and renewable plastics.

As Enerpower provides a solution on all commercial solar panel installations, the Castle Paints team now enjoy the benefits of this process as they have reduced their electricity cost resulting in overall energy savings. Enerpower had full control of the design, install and the commissioning of this renewable energy source.

Enerpower installed a solar PV array on two units at Castle Paints facility. 22.5kWp was installed on the roof of the main shop and another 22.5kWp was installed on the roof of the warehouse.

The Solar PV arrays will align with the companies aim to reduce their carbon footprint. A 340W MBB Half-Cell Module mounting system was used for both unit installations. These panels have a high output of power and lower resistive loss.

The Sun2000 Huawei Inverters were used during this installation. These 3 phase grid-tied PV string inverters converts the DC power generated by the strings into AC power and feeds into the site LV Network. ESB witness testing has confirmed that the installation complies with the Zero Export and Grid Protection Requirements.

So far, the 2-unit system has generated over 8MWh of renewable energy for Castle Paints facility. Along with this, they have avoided 8.85 tons of Co2 emissions, this is the equivalent of planting 484 trees.

Enerpower were delighted to have helped Castle Paints on their way to reaching their sustainability goals. Enerpower are Ireland Leading Renewable Energy Company and if you would like to learn more about the transition to renewable energy for your company please contact us on 051 364 054

 

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • Tricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Confederation House, Block C&D, Waterford Business Park, Cork Rd, Waterford, X91T449

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
195kWp Solar system installation at Ire Wel Pallets facility 300kWp Solar Panel System installed at Essexford Joinery Facility.
Scroll to top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok