• Facebook
  • Twitter
  • LinkedIn
  • Instagram
  • Youtube
Call: +353 (0) 51 364054
Enerpower
  • Home
  • About
    • Why Choose Us?
    • Our Customers
    • Our Mission
    • Careers at Enerpower
    • Enerpower Locations
    • News
    • Case Studies
  • Solar PV
  • Heat Pumps
  • Wind Turbines
  • Biomass Boilers
    • Biomass Boiler Service and Maintenance
  • Projects
    • Solar PV Projects
    • Biomass Projects
    • Heat Pump Projects
    • District Heating Projects
    • Power Purchase Agreement (PPA) Projects
    • Wind Turbine Projects
  • Finance
    • Grant
    • Better Energy Communities
    • Power Purchase Agreement (PPA)
    • Support Scheme for Renewable Heat ( SSRH )
  • Contact
  • Menu Menu

St Patrick’s Hospital Installs Pellet Boiler

St. Patrick’s hospital is run by the HSE and serves the elderly population of south Tipperary. In conjunction with the SEI, the HSE is committed to achieving energy savings of 33% by 2020 as set out in the public sector white paper “Delivering a Sustainable Energy Future for Ireland”. The HSE identified a number of specific actions to reduce energy consumption and greenhouse gas emissions, which includes a heating fuel conversion programme and in some instances to upgrade existing fossil fuel burners to biomass.

The HSE replaced their oil boiler with a Gilles 240kW HPK-IK wood pellet boiler. The pellets are blown into a purpose built fuel store. The biomass boiler was integrated into the existing heat system. An oil boiler remains on site as a backup. This project has conserved 168 tonnes of carbon per year. Enerpower have been contracted to provide maintenance which includes an annual site visit and emergence callout.

Biomass boilers are an ideal soulution for heating hospitals and nursing homes. Enerpower take pride that we offer a complete turnkey solution, please contact us for more information.

Contact us on +353 051 364 054 for more information or email us directly below.

Latest Case Studies

  • rooftop-solarSysco formally Pallas Foods install a 1MW Rooftop Solar Array at facility in Co. DublinMarch 20, 2022 - 1:33 pm
  • SOLAR-PV-SYSTEMSTricel facility in Co. Kerry saw the installation of a 776kWp Solar PV SystemMarch 8, 2022 - 11:53 am
  • solar-carport-at-wicklowWicklow County Council sees the installation of a 300kWp Solar Carport at their facilityJanuary 28, 2022 - 10:11 am
  • reduction-in-energy-consumption-with-heat-pumpsRenewable energy heating system installed at Banagher Concrete facility.January 21, 2022 - 10:37 am
  • GROUND-MOUNTED-ARRAY500kWp Ground Mounted Solar Array Installation at A.W Ennis Facility.January 17, 2022 - 12:14 pm

Case Study Archive

  • 2022 (5)
  • 2021 (13)
  • 2020 (4)
  • 2019 (8)
  • 2018 (8)
  • 2017 (11)
  • 2016 (7)
  • 2015 (6)
  • 2014 (3)
  • 2013 (2)
  • 2012 (16)
  • 2011 (7)

Contact Us

IRELAND: +353 (0) 51 364054
UK: +44 (0)20 3695 7809
EMAIL: info@enerpower.ie

Waterford Office: Unit 24, Waterford Business Park, Cork Road, Waterford. X91 FW61.

UK Office: Unit 2, Building A, Occ Estate, 102 Vale Road, London N4 1FL

Social Media

Company Information

Privacy Policy
Site Map
Terms & Conditions

© Copyright - Enerpower - Web Design by Márla.ie
Errigal Youth Hostel Installs A Gilles Pellet Boiler biomass Pellet Boiler Wood Chip Boiler Installation Private Household Dublin
Scroll to top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok