Picture case study: Wind Turbine Installation
Wind Turbine foundations are laid:
Wind turbine pedestal:
Concrete is poured into the wind turbine foundations:
Close up of the wind turbine’s nuts and bolts:
Wind turbine erection:
The second and third sections of the wind turbine tower are lifted into place:
The wind turbine blades are positioned:
Finished wind turbine: